Loading the 3D model…

About 1–3 MB the first time
Have your say

About this model

Made in good faith. This is a best-efforts attempt by a local resident to show what the exhibited draft could mean on the ground: the building envelopes in Inner West Council's Draft Design Guide, Appendix 2 – Our Fairer Future Plan 2 (September 2026), section 4.1, for sites F (Post Office / Johnston St), G (148 Wigram Rd) and H (Booth St / Nelson St), set beside the buildings that are there now. The Lilyfield tab does the same for section 4.6: sites C (73 White St), D (9–15 White St), E (Balmain Rd) and F (1–11 Edward St block), and the Leichhardt tab for section 4.5: H (7 Darley Rd), H1 (Hubert and Francis Sts), I (237 Marion St) and J (Darley Rd / Lyall St precinct), and the Rozelle tab for section 4.9: F (Toelle and Manning Sts), G (Callan and Toelle Sts) and H (2 Burt St); Marrickville (§4.7: F1, F2, H), Petersham (§4.8: G), Stanmore (§4.11: Percival Rd) Newtown (§4.12: B, C) and Balmain (§4.3: D) and Croydon (§4.2: Iron Cove Creek precinct C) and St Peters (§4.10: site D, 159 Princes Hwy) and Ashfield (§4.13: site K only – the guide's other Ashfield precincts give setbacks but no height diagrams). The aim is to help neighbours picture the proposed changes and take part in the conversation – nothing more.

Please read. This is a demonstration, not a survey, a plan, a design or professional advice. It uses public data and simplifications and will contain errors. Please don't rely on it for any decision about property, investment, building or planning – check Council's own documents and make your own enquiries. It is unofficial, is not connected with or endorsed by Inner West Council or the NSW Government, and is provided as-is with no warranty. If it looks wrong, tell me.

How to read it

What the blue shows – and doesn't

How the existing buildings were made

Privacy

Sources

Contact, corrections & how to have your say with Council →

Report a mistake or something missing

This model is made from public data and Council's indicative diagrams, so it will have errors. If you know the area, your correction helps – thank you.

Your email program opens with this ready to send to the model's feedback address. Nothing is sent or stored by this page. Your own details are only used to reply to you.

✉ Email this report

To comment on the plan itself, make a submission to Council – feedback closes 28 October 2026.